HomeSupporting equipmentWater spray tower equipment

      Water spray tower equipment

      As a type of environmental waste gas treatment equipment, it exists and is divided into circulating water spray towers according to its working principle. According to the material of the tower, it is divided into fiberglass spray towers, PP spray towers, and stainless steel spray towers. Choose a reasonable spray material and spray process based on the different properties of the exhaust gas. The exhaust gas is introduced into the PP spray tower through the air duct. After passing through the packing layer, the exhaust gas and sodium hydroxide absorption liquid undergo gas-liquid two-phase full contact absorption and neutralization reaction. After purification, the acid mist exhaust gas is dehydrated and demisted by a defogging plate before being discharged into the atmosphere by a fan. The absorption liquid is pressurized by a water pump at the bottom of the tower and sprayed down at the top of the tower. Later, it flows back to the bottom of the tower for recycling. The purified acid mist exhaust gas meets the emission requirements of local emission standards.

      Dear [Water spray tower equipment] customer, it is very lucky that you can find us in the vast information! Embrace change, innovation-driven, and build a better future together .Since its establishment, Henan Maoxin Machinery Equipment Co., Ltd has been deeply involved in the Lithium battery and circuit board recycling field and has tried to provide user-friendly Water spray tower equipment products for Lithium battery and circuit board recycling customers! The following is the relevant information of Water spray tower equipment product organized by Maoxin Machinery for you. 
       

      Equipment Introduction

      As a type of environmental waste gas treatment equipment, it exists and is divided into circulating water spray towers according to its working principle. According to the material of the tower, it is divided into fiberglass spray towers, PP spray towers, and stainless steel spray towers. Choose a reasonable spray material and spray process based on the different properties of the exhaust gas. The exhaust gas is introduced into the PP spray tower through the air duct. After passing through the packing layer, the exhaust gas and sodium hydroxide absorption liquid undergo gas-liquid two-phase full contact absorption and neutralization reaction. After purification, the acid mist exhaust gas is dehydrated and demisted by a defogging plate before being discharged into the atmosphere by a fan. The absorption liquid is pressurized by a water pump at the bottom of the tower and sprayed down at the top of the tower. Later, it flows back to the bottom of the tower for recycling. The purified acid mist exhaust gas meets the emission requirements of local emission standards.

      When dusty or oily waste gas passes through the spray tower, a suitable position inside the tower (depending on the design) sprays out liquid media, some are alkaline solution, and some are sulfuric acid solution. If the exhaust gas contains acidity, choose alkaline spray to neutralize the acidity. If the exhaust gas contains alkalinity, choose sulfuric acid solution for absorption. The specific choice of acid-base solution depends on the nature of the waste gas and the situation of the enterprise itself. No acid or alkali, but oily or dusty waste gas can be treated by spraying a circulating water solution. When the exhaust gas enters from the bottom of the tower, it comes into contact with the spray medium sprayed out by the spray tower. After contact, the exhaust gas or oil pollution is wrapped in water droplets, and the water droplets that wrap the pollutants collide again, increasing the surface area and gravity. Under the influence of gravity, water droplets that wrap around pollutants fall into the bottom of the spray tower, with heavier pollutants settling at the bottom of the tower and lighter pollutants floating on the surface of the circulating water body.

      Design considerations

      1. When the exhaust gas contains oil and dust, it is necessary to consider whether to add filter fillers or nozzle models when designing the spray tower. Choosing an inappropriate nozzle can easily cause blockage in the spray tower water system.

      2. Choose the appropriate spray medium.

      3. Design reasonable airflow channels and water supply methods.

      4. Wastewater discharge and cleaning issues after spray tower spraying.

      5. Choose the appropriate water pump based on the appropriate gas-liquid ratio.

      6. The flow rate of an empty tower is generally designed to be 1-6 meters per second. But in the case of medium spraying and filling, the filtering wind speed can be reasonably selected based on the specific situation of the exhaust gas.


      Sincere cooperation and win-win futureIn today's manufacturing industry, the spirit of craftsmanship remains important.Henan Maoxin Machinery Equipment Co., Ltd has been dedicated to Smart technology makes life better for many years, sticking to the Lithium battery and circuit board recycling field, and polishing "craftsman" level talents on Water spray tower equipment! The heart is in the rhythm of energy conservation and emission reduction, and the love is in harmony with the green and low-carbon.


      Maoxin takes Sao Tome friends to see China! The indomitable national spirit and manufacturing prowess of China are key factors behind its success.



      There are many historical and cultural heritages in China.
      Maoxin Machinery believe these cultural stories with a long history are attractive enough to make Sao Tome friends interested in Chinese Water spray tower equipment products.



      This cultural heritage is alluring to Sao Tome friends:

      The Grand Canal is lined with historic towns and villages, many of which have preserved their traditional architecture and customs. Visitors can explore these charming settlements and gain insight into the daily life of ancient Chinese communities. Additionally, the canal itself is home to a variety of distinctive bridges, locks, and sluices that reflect the ingenuity of Chinese engineers and their deep respect for the natural environment.
      The canal required an enormous amount of labor to construct and maintain, with many sections requiring hand-digging by armies of laborers over several centuries. It features a range of innovative structures, including multiple-tiered locks that enable boats to navigate between different levels of water, and intricate sluice gates that regulate the flow of water.
      The Grand Canal is also a testament to the perseverance and ingenuity of the Chinese people. Despite the challenges of constructing such a massive waterway, ancient engineers were able to build a transportation network that connected regions thousands of kilometers apart. Today, while much of the canal has been replaced by modern highways and railways, it remains an important symbol of China's enduring cultural heritage and technological prowess.

      Build long-term relationships and grow organically.

      The right balance of people, process and technology allows us to consistently exceed customer expectations in terms of quality, precision, speed and cost. Let's talk about your next project and how we can meet your specific requirements.

      Maoxin respect your privacy. We will not proactively communicate with you anything beyond your wishes!
      Headquarters
      HENAN, CHINA
      Gongyi City West Industrial Zone, Henan Province, China
      Phone: +86 18539447368
      Whatsapp: {whatsapp}

      get in touch with us
      Contact

      Gongyi City West Industrial Zone, Henan Province, China

      Phone (WeChat): +86 18539447368

      Email: 18539447368@163.com